OKC FireProtection
    (405) 555-0199Request Inspection
    NFPA 25

    Fire Sprinkler Testing in Oklahoma City, OK

    Fire sprinkler testing is the physical, functional verification that your sprinkler system's water supply, alarms, and control valves perform as designed. While inspection is the visual examination, testing physically exercises the system — running main drain tests, triggering waterflow alarms, and verifying pressure. Oklahoma City Fire Protection performs NFPA 25 sprinkler testing for commercial properties across the OKC metro.

    Inspection at a glance

    NFPA Code
    NFPA 25
    Frequency
    NFPA 25 requires annual main drain and waterflow alarm tests, with dry pipe trip tests annually and full system tests at intervals defined by the code
    Response
    Within 24 hours
    Request this inspection
    What This Is

    Understanding fire sprinkler testing

    Sprinkler testing physically exercises the system: main drain tests verify water supply adequacy, waterflow alarm tests confirm the alarm activates when water flows, and control valve tests verify proper operation.

    NFPA 25 defines specific test intervals and methods. Annual main drain tests and waterflow alarm tests are required, with additional tests at 5-year intervals for internal piping and sprinkler head samples.

    We test and document — we do not repair. Deficiencies found during testing are reported for your licensed sprinkler contractor to correct.

    What We Inspect

    Our inspection checklist

    • Main drain test — verify water supply pressure and flow
    • Waterflow alarm test — electric bell and water motor gong
    • Dry pipe and pre-action system trip tests (where applicable)
    • Control valve operation and tamper switch testing
    • Antifreeze solution concentration test (where applicable)
    • Fire department connection (FDC) flow verification
    • Pressure-reducing and pressure-regulating device tests

    Inspection frequency

    NFPA 25 requires annual main drain and waterflow alarm tests, with dry pipe trip tests annually and full system tests at intervals defined by the code. Five-year internal piping inspections and sprinkler head sampling are also required.

    Why It Matters

    Benefits of staying compliant

    Verify your water supply can deliver adequate pressure and flow

    Confirm alarms activate when a sprinkler discharges

    Detect degraded water supply, closed valves, or blocked piping

    Document NFPA 25 compliance for your AHJ and insurance carrier

    How It Works

    Our inspection process

    1. Coordinate

    We schedule testing to minimize water disruption and coordinate with building occupants.

    2. Test

    Our licensed technician performs main drain, waterflow alarm, and valve tests per NFPA 25 and records all results.

    3. Document

    You receive a complete test report with pressures, flow results, alarm verification, and any deficiencies.

    Oklahoma code requirements

    Oklahoma enforces NFPA 25 through the State Fire Marshal's Office and local fire departments. Annual sprinkler testing is mandatory for commercial properties, and test records must be retained for AHJ review.

    Industries Served

    Who needs this inspection

    Office BuildingsApartmentsHotelsHealthcareSchoolsRetailWarehousesRestaurants
    FAQ

    Fire Sprinkler Testing FAQs

    Get a Free Quote

    Schedule your fire protection inspection

    Tell us about your property and the services you need. We'll send a same-day quote and get you on the schedule — usually within 24 hours across the Oklahoma City metro.

    We respond within one business day. No obligation, no spam.

    Ready to schedule your fire protection inspection?

    One inspection. One report. Fully compliant. We handle every fire and life safety system for your commercial property — so you stay compliant without juggling multiple vendors.